Fee Details:

15979: Racking Test

Initial setup, testing, and takedown of racking tests. The bottom of racking test is anchored to a steel base, while the top is attached to a load distribution beam. The beam distributes the force of the actuator, which is anchored to the reaction wall. Depending on the complexity of the project additional hours may be required. Additional supplies billed at cost.
Unit:
College of Forestry/Forest Research Lab
Department:
TallWood Design Institute
Category:
TallWood Design Institute
Internal:
Yes
External:
Yes
Banner Index:
FOR186
Fund:
057310
Org:
234020
Program:
20600
Activity:
Amount:
$174.00/hour
Submitted By:
Christina Fierro
Requester:
Iain Macdonald
Updated:
4/2/2021
Banner Index Title:
FOR - TallWood Design Testing Svcs
Fund Title:
FOR - TallWood Design Testing Svcs
Org Title:
FOR - TallWood Design Institute Ops
Program Title:
Other Public Services/Testing
Activity Title:

History:

15979: Racking Test

Initial setup, testing, and takedown of racking tests. The bottom of racking test is anchored to a steel base, while the top is attached to a load distribution beam. The beam distributes the force of the actuator, which is anchored to the reaction wall. Depending on the complexity of the project additional hours may be required. Additional supplies billed at cost.
Unit:
College of Forestry/Forest Research Lab
Department:
TallWood Design Institute
Category:
TallWood Design Institute
Internal:
Yes
External:
Yes
Banner Index:
FOR186
Fund:
057310
Org:
234020
Program:
20600
Activity:
Amount:
$174.00/hour
Submitted By:
Christina Fierro
Requester:
Updated:
6/23/2020
Banner Index Title:
FOR - TallWood Design Testing Svcs
Fund Title:
FOR - TallWood Design Testing Svcs
Org Title:
FOR - TallWood Design Institute Ops
Program Title:
Other Public Services/Testing
Activity Title:

15979: Racking Test

Initial setup, testing, and takedown of racking tests. The bottom of racking test is anchored to a steel base, while the top is attached to a load distribution beam. The beam distributes the force of the actuator, which is anchored to the reaction wall. Depending on the complexity of the project additional hours may be required. Additional supplies billed at cost.
Unit:
College of Forestry/Forest Research Lab
Department:
TallWood Design Institute
Category:
TallWood Design Institute
Internal:
Yes
External:
Yes
Banner Index:
FOR318
Fund:
001423
Org:
234020
Program:
16010
Activity:
Amount:
$161.00/hour
Submitted By:
Christina Fierro
Requester:
Updated:
6/5/2020
Banner Index Title:
FOR - TallWood Design Research
Fund Title:
FOR - Advanced Wood Products Prog
Org Title:
FOR - TallWood Design Institute Ops
Program Title:
Internally Funded Research
Activity Title:

Oregon State University
Office of the Controller-Financial Accounting & Analysis
100 Kerr Administration Building
Corvallis, OR 97331
541-737-5422
Copyright © Oregon State University, 2011